Load Testing and Recertification of Offshore Knuckle Boom Cranes
How to plan proof load tests and five-yearly recertification of offshore knuckle boom cranes: standards, test methods, acceptance evidence, documentation and a practical checklist for operations engineers.
22 Nov 2026 · 9 min read
Flow Assurance for Long-Distance Subsea Tiebacks: Hydrates, Thermal Design and Chemical Injection
How to design hydrate management, thermal performance and chemical injection for long subsea tiebacks to existing hosts, with the late-life shutdown case as the controlling scenario, plus a decision checklist.
17 Nov 2026 · 9 min read
LNG Carrier Boil-Off Management and Insulation Integrity After Hull Damage
How heat ingress changes after hull damage, how to manage BOG disposal options, and how to sequence insulation integrity checks and safe entry on LNG carriers without creating a second hazard.
08 Nov 2026 · 9 min read
Subsea tieback design: flow assurance, host selection and tie-in architecture for near-infrastructure discoveries
How to test distance, pressure, chemical injection and riser-versus-manifold choices early in a near-host subsea tieback, so shutdown, slugging and host-capacity problems do not erode marginal field economics.
25 Oct 2026 · 11 min read
Riser Selection for Deepwater Tiebacks: Flexible Pipe, SCR, or Top-Tensioned
Compare flexible risers, SCRs and top-tensioned risers for deepwater tiebacks across water depth, vessel motion tolerance, fatigue life and integration with existing host infrastructure.
08 Oct 2026 · 9 min read